REQUIREMENTS
0.2 – 0.5 acre
Sites to be located a maximum of 1.5 miles or a three minute drive from major M or A roads
Access to charging bays 24/7
Retail parks and development sites considered

WHAT WE OFFER
Additional draw to your location / scheme
Leasehold or freehold
Up to 25 year lease without breaks
Secure rental income with annual rental uplifts

OUR MISSION
Future-proof technology with up to 350kW charging power per charger
Open network for all brands of EVs
Powered by 100% green energy

 

Contact:  Mark Frostick l 07785 522 958